Project No. | Nature Of Job | Name Of Project | Owner/Client | Month of Start | Month of Comp. | Quantity of Work |
---|---|---|---|---|---|---|
1 | Road Alignment and Top graphical Survey |
Strengthening and Rehabilitation works Morena ( SH-23) |
KNR Construction | Sep-06 | Dec-06 | 68 Km |
2 | Preliminary & Detailed Survey |
Route-alignment & Detailed survey works for 120 KV. D/C ShalmaDam-Hirat (Afiganastan) |
Wapcos | May-06 | July-06 | 85 Km |
3 | Preliminary & Detailed Survey |
Route-alignment & Detailed survey works for 220 KV. D/C Noida to Sector129 (U.P.) |
Hydro Power Corporation Ltd. |
Oct.07 | Dec-07 | 18 Km |
4 | Preliminary & Detailed Survey |
Route-alignment & Detailed survey works for 132kV. S/C sohanwal- Milikipur (U.P.) |
VRCL | Nov.07 | March-08 | 47 Km |
5 | Preliminary & Detailed Survey |
Route-alignment & Detailed survey works for 132kV. S/C Bettiah- Raxual (Bihar) |
IVRCL | Dec.07 | April-08 | 50 Km |
6 | Preliminary & Detailed Survey |
HVPNL( KRUSHETRA) | ARAVALI | Dec.07 | April-08 | 24 Km |
7 | Preliminary & Detailed Survey |
132 KV D/C Darbhanga-Phulparas Transmission Line. |
KEC International Ltd. |
April-08 | August.- 08 |
76 Km |
8 | Preliminary & Detailed Survey |
132 KV D/C Supaul-Kataiya Transmission Line |
KEC International Ltd. |
April-08 | August.- 08 |
55 Km |
9 | Preliminary & Detailed Survey |
132 KV D/C Biharsharif-Hulasgang (Lilo) Transmission Line |
KEC International Ltd. |
April-08 | August.- 08 |
18 Km |
10 | Preliminary & Detailed Survey |
220 KV D/C New Bhuswal- Amalner Transmission Line |
Associated Transrail Structures Ltd. |
July-08 | Sep.-08 | 85 Km |
11 | Preliminary & Detailed Survey |
400 KV D/C Koderma- Biharsharif- Transmission Line |
KEC International Ltd. |
Augu-08 | Nov.-08 | 90 Km |
12 | Preliminary / Detailed and Check Survey |
765KV S/C Gaya-Ballia Transmission Line |
Associated Transrail Structures Ltd. |
Sep-08 | Sep.-09 | 226 Km |
13 | Preliminary & Detailed Survey |
400KV D/C Lakhpat-Ranchodpura Transmission Line |
Associated Transrail Structures Ltd. |
Mar.-09 | August-09 | 50 Km |
14 | Preliminary & Detailed Survey |
765KV S/C Bhiwani-Jatikalan Transmission Line |
Emco Limited | Sep-09 | Jan.-10 | 85 Km |
15 | Preliminary & Detailed Survey |
765KV S/C Agra-Meerut (I) Transmission Line |
Emco Limited | Sep-09 | Jan.-10 | 120 Km |
16 | Preliminary & Detailed Survey |
400KV D/C Indore-New Indore Transmission Line |
Emco Limited | Oct-09 | March.- 10 |
85 Km |
17 | Preliminary & Detailed Survey |
± 800 Kv HVDC NidhuaraVillage- Agra Transmission Line |
Larsen & Toubro Limited |
Nov-09 | Jun-10 | 150 Km |
18 | Preliminary & Detailed Survey |
765 KV S/C Bina-Indore Transmission Line |
Emco Limited | Jan-10 | April.-10 | 105 Km |
19 | Preliminary & Detailed Survey |
400KV D/C Orai-Mainpuri Transmission Line |
Gammon India Ltd | Oct.-10 | Feb.-10 | 95 Km |
20 | Preliminary & Detailed Survey |
400KV D/C Paricha- Orai- Transmission Line |
Gammon India Ltd | Oct.-10 | Feb.-10 | 60 Km |
21 | Soil Investigation | 400KV D/C Orai-Mainpuri Transmission Line |
Gammon India Ltd | Oct.-10 | Feb.-10 | 25 Loc |
22 | Topographical/ Contour Survey |
132/220 KV Sub Station Jhusi (U.P.) |
Crompton Greaves Ltd. |
April-10 | April-10 | 5 Acre |
23 | Preliminary & Detailed Survey |
765 KV S/C Meerut-Bhiwani Transmission Line |
Spic –SMO | July-10 | Dec-10 | 65 Km |
24 | Preliminary & Detailed Survey |
765 KV S/C Jhusi-Unnow Transmission Line |
Gammon India Ltd | July-10 | Nov-10 | 180 Km |
25 | Check Survey | 765 KV S/C Agra-Fathepur Transmission Line |
Gammon India Ltd | July-10 | Nov-10 | 80 Km |
26 | Soil Investigation | 765 KV S/C Jhusi-Unnow Transmission Line |
Gammon India Ltd | Oct.-10 | Nov-10 | 30 Loc |
27 | Preliminary & Detailed Survey |
400 KV D/C Maudha -Wardha Transmission Line |
Bajaj Electrical | Augu.-10 | Nov-10 | 125 Km |
28 | Topographical/ Contour Survey |
765/400/220 KV Bhiwani Sub Station |
PGCIL | Sep.-10 | Sep.-10 | 18 Acre |
29 | Preliminary & Detailed Survey |
400 KV D/C Biharsharif -Purniya Transmission Line |
Bajaj Electrical | Augu.-10 | Apr-11 | 230 Km |
30 | Preliminary & Route Alignment Survey ( Bout Tender Purpose) |
765 KV S/C Jabalpur- Bina - Transmission Line |
Larsen & Toubro Limited |
Nove.-10 | Dec-11 | 246 Km |
31 | Preliminary & Route Alignment Survey ( Bout Tender Purpose) |
765 KV S/C Auranga Bad-Dhule- Transmission Line |
Larsen & Toubro Limited |
Dec-10 | Feb-11 | 230 Km |
32 | Preliminary & Detailed Survey |
132KV S/C Nanpara-Dharahara Transmission Line |
Aravali Infrapower Limited |
Marc-11 | July-11 | 55 Km |
33 | Preliminary & Detailed Survey |
765 KV S/C Gwalior-Jaipur Transmission Line |
Larsen & Toubro Limited |
April-11 | Nov-11 | 145 Km |
34 | Preliminary & Detailed Survey |
400 KV D/C Hindaunr-Alwar Transmission Line |
Larsen & Toubro Limited |
April-11 | Nov-11 | 95 Km |
35 | Route alignment /Soil Investigation |
400 KV (Quad) Kurukshetra- Jallandhar |
PGCIL | August- 11 |
Running | 260 Km |
36 | Topographical/ Contour Survey |
132/220 KV Faridabad Sub Station | Cropton Gravels | Oct.-11 | Nov.-11 | 5 Acres |
37 | Preliminary & Detailed Survey |
765 KV S/C Gwalior-Jaipur Transmission Line ( II Pacak) |
Gammon India Ltd | Nov-11 | Jan-12 | 145 Km |
38 | Check Survey | 765 KV S/C Gwalior-Jaipur Transmission Line ( II Pacak) |
Gammon India Ltd | Nov-11 | Apri-12 | 145 Km |
39 | Preliminary & Detailed Survey |
400 KV D/C Barelli-Kasipur Transmission Line |
EMC | Nov-11 | Apri-12 | 80 Km |
40 | Preliminary & Detailed Survey |
400 KV D/C Kasipur-Rurkee Transmission Line |
EMC | Nov-11 | Jan-12 | 80 Km |
41 | Preliminary & Detailed Survey |
765 KV S/C Gwalior-Jaipur Circut- II Transmission Line ( II Pacak) |
Larsen & Toubro Limited |
Dec-11 | Mar-12 | 145 Km |
42 | Diversion of 400/220 kv Line |
400/220Kv Line Under Bassi Power Grid |
PGCIL | Dec-11 | Jan-12 | 18 Km |
43 | Preliminary & Detailed Survey |
765 KV D/C Varanasi-Kanpur Transmission Line |
Larsen & Toubro Limited |
Mar-12 | July-13 | 165 Km |
44 | Preliminary & Detailed Survey |
Modification of Line due to under construction Delhi Metro |
DMRC | Feb-12 | Apri-12 | 18 Km |
45 | Soil Investigation | 400KV D/C Orai-Mainpuri Transmission Line |
Jyoti Power Corporation |
April-12 | May-12 | 25 Loc. |
46 | Preliminary & Detailed Survey |
400 KV D/C (Quad) Varanasi- Sarnath Transmission Line |
Larsen & Toubro Limited |
May-12 | July-13 | 105 Km |
47 | Preliminary & Detailed Survey |
400 KV D/C (Quad) Bad- Gorakhpur Transmission Line |
Larsen & Toubro Limited |
May-12 | Feb-13 | 185 Km |
48 | Preliminary & Detailed Survey |
EARTH ELECTRODE CIRCUIT - II (S/C PORTION) |
Larsen & Toubro Limited |
Jun-12 | Nov-12 | 35 Km |
49 | Soil Investigation/ Compression Test |
765 KV D/C Varanasi-Kanpur Transmission Line |
Larsen & Toubro Limited |
Sep-12 | Nov-12 | 87 Loc |
50 | Soil Investigation/ Compression Test |
400 KV D/C (Quad) Varanasi- Sarnath Transmission Line |
Larsen & Toubro Limited |
Sep-12 | Nov-12 | 37 Loc |
51 | Preliminary & Detailed Survey |
765KV D/C Kurnool- Tiruvalem Transmission Line (Package-1) |
Bajaj Electricals | Sep-12 | Jan-13 | 123 Km |
52 | Preliminary & Detailed Survey |
400 KV D/C (Quad)Sasaram- Varanasi Transmission Line |
Larsen & Toubro Limited |
Nov-12 | Mar-13 | 125 Km |
53 | Soil Investigation/ Compression Test |
400 KV D/C (Quad) Bad- Gorakhpur Transmission Line (PCK-1) |
Larsen & Toubro Limited |
Nov-12 | Feb-13 | 44 Loc |
54 | Soil Investigation/ Compression Test |
400 KV D/C (Quad) Bad- Gorakhpur Transmission Line (Pck-2) |
Ranjeet singh & Company |
Nov-12 | April-13 | 44 Loc |
55 | Preliminary & Detailed Survey |
765KV S/C Meerut- Moga Transmission Line (Package-1) |
Gammon India Limited |
Nov-12 | April-13 | 172 Km |
56 | Preliminary & Detailed Survey |
800 KV HVDC Champa- KurukshetraTransmission Line (Pck-2) |
Gammon India Limited |
Nov-12 | June-13 | 230 Km |
57 | Preliminary & Detailed Survey |
800 KV HVDC Champa- KurukshetraTransmission Line (Pck-6) |
Larsen & Toubro Limited |
Jan-13 | July-3 | 230 Km |
58 | Compaction Test | 765 Kv D/C Bina-Jabal Pur (Ckt -2) | Larsen & Toubro Limited |
Jan-13 | April-13 | 300 Loc. |
59 | Preliminary & Detailed Survey |
400 KV D/C Kurukshetra- Jallandhert Transmission Line (Pck-1) |
Larsen & Toubro Limited |
April-13 | Sep-13 | 124 Km |
60 | Preliminary & Detailed Survey |
765KV S/C Ballia-Varanasi Transmission Line |
KEC International | April-13 | Nov-13 | 165 Km |
61 | Preliminary & Detailed Survey |
400 KV D/C Gandhar-Dehgam Transmission Line |
PGCIL | April-13 | Jun-13 | 12 Km |
62 | Preliminary & Detailed Survey |
400 KV D/C Rapp-D-Jaipur (South) Transmission Line |
PGCIL | June-13 | Running | 48 Km |
63 | Measurement of Vertical Clearence up to 66 Kv Line |
Under Lucknow Power Grid | PGCIL | July-13 | July-13 | 52 Loc |
64 | Measurement of Vertical Clearence up to 66 Kv Line |
Under Bassi(Jaipur) Power Grid | PGCIL | July-13 | July-13 | 39 Loc |
65 | Measurement of Vertical Clearence up to 66 Kv Line |
Under Azamgarh Power Grid | PGCIL | Oct-13 | Oct-13 | 39 Loc |
66 | Measurement of Vertical Clearence up to 66 Kv Line |
Under Raibarelli Power Grid | PGCIL | Nov-13 | Nov-13 | 12 Loc |
67 | Measurement of Vertical Clearence up to 66 Kv Line |
Under Azamgarh Power Grid | PGCIL | Dec-13 | Dec-13 | 15 Loc |
68 | Conducting Survey of Boundary using D.G.P.S. in forest area at Kurnool, Ranges at Kurnool-Tiruvalam Line. |
Under Kurnool Power Grid | PGCIL | Dec-13 | Dec-13 | 13 Hec |
69 | Preliminary, Detailed & Check Survey |
400 KV D/C Muzaffer Pur-Sursand Transmission Line |
KEC International | Jan-14 | May-14 | 86 Km |
70 | Measurement of Vertical Clearence up to 66 Kv Line |
Under Kanpur Power Grid | PGCIL | April-14 | May-14 | 158 Loc |
71 | Preliminary & Detailed Survey |
132 kv D/C Mathurapur(Dehri) to DFCCIL'S 132/54 KV TSS, Karwandiya (Sasaram) |
Larsen & Toubro Limited |
April-14 | June-14 | 14 Km |
72 | Tower Foundation (Civil Work) |
LILO of 400 Kv D/C (Twin) Sasaram-Allahabad Transmission Line at Varanasi |
Larsen & Toubro Limited |
April-14 | August-14 | 30 Loc |
73 | Boom Project Survey (Route Alignment & Detail survey) | 765KV D/C Jabalpur - Vindyachal Transmission line | Larsen & Toubro Limited | Oct-14 | Nov-14 | 360 Km |
74 | Boom Project Survey (Route Alignment & Detail survey) | 765KV D/C Jabalpur - Gadarwara Transmission line | Larsen & Toubro Limited | Oct-14 | Nov-14 | 102 Km |
75 | Boom Project Survey (Route Alignment & Detail survey) | 765KV D/C & Gadarwara - Warora Transmission line | Larsen & Toubro Limited | Nov-14 | Dec-14 | 315 Km |
76 | Boom Project Survey (Route Alignment & Detail survey) | 765 KV D/C Parli(New)- Warora Transmission line | Larsen & Toubro Limited | Dec-14 | Jan-15 | 305 Km |
77 | Boom Project Survey (Route Alignment & Detail survey) | 765 KV D/C Solapur - Parli (New) Transmission line | Larsen & Toubro Limited | Nov-14 | Dec-14 | 128 Km |
78 | Boom Project Survey (Route Alignment & Detail survey) | 400 kV DC Nizamabad - Yeddumailaram (Shankarapalli) Transmission line | Larsen & Toubro Limited | Nov-14 | Dec-14 | 140 Km |
79 | Boom Project Survey (Route Alignment & Detail survey) | 400 KV Maheshwaram (PG) - Mehboob Nagar Transmission line | Larsen & Toubro Limited | Jan-15 | Jan-15 | 98 Km |
80 | Boom Project Survey (Route Alignment & Detail survey) | 765 kv DC Bilaspur-Rajnandgaon Transmission Line | Larsen & Toubro Limited | Jan-15 | Running | 168 Km |
81 | Boom Project Survey (Route Alignment & Detail survey) | 765 kv DC Warora-Rajnandgaon Transmission Line | Larsen & Toubro Limited | Jan-15 | Running | 245 Km |
82 | Boom Project Survey (Route Alignment & Detail survey) | 765 kv DC Raipur-Rajnandgaon Transmission Line | Larsen & Toubro Limited | Jan-15 | Mar-15 | 36 Km |
83 | Boom Project Survey (Route Alignment & Detail survey) | 765 kv DC Sipat - Bilaspur Transmission Line | Larsen & Toubro Limited | Jan-15 | Running | 22 Km |
84 | Boom Project Survey (Route Alignment & Detail survey) | 765 kv DC Raigarh - Champa Transmission Line | Larsen & Toubro Limited | Jan-15 | Mar-15 | 76 Km |
85 | Preliminary & Detailed Survey/Check Survey | 400 kv Dc Allahabad-Banda Transmission Line | Larsen & Toubro Limited | Apr-15 | Running | 170 Km |
86 | Preliminary & Detailed Survey/Check Survey | 765 kv DC Orai-Aligarh Transmission Line | Larsen & Toubro Limited | Apr-15 | Running | 70 Km |
87 | Preliminary & Detailed Survey/Check Survey | 400 KV D/C Orai-Orai Transmission Line | Larsen & Toubro Limited | Apr-15 | Running | 76 Km |
88 | Route Alignment & Detailed Survey | 220 KV D/C Darbhanga Samastipur Transmission Line | Larsen & Toubro Limited | Jun-15 | Dec-15 | 80 Km |
89 | Route Alignment & Detailed Survey | 220 KV D/C Darbhanga -Laukhi Transmission Line | Larsen & Toubro Limited | Jun-15 | Dec-15 | 98 Km |
90 | Route Alignment & Detailed Survey | 765 KV D/C Warora-Rajnandgaon TL Transmission Line | Gammon India Ltd | Jun-15 | Mar-16 | 260 Km |
91 | Route Alignment & Detailed Survey | 765 KV D/C Warora-Rajnandgaon TL Transmission Line | Gammon India Ltd | Jun-15 | Aug-15 | 21 Km |
92 | Route Alignment & Detailed Survey | 220 KV D/C Supaul -Laukhi Transmission Line | Larsen & Toubro Limited | Jun-15 | Dec-15 | 40 Km |
93 | Route Alignment & Detailed Survey | 220 KV D/C Sheikpura (New) - Jamlpur Transmission Line | Larsen & Toubro Limited | Jun-15 | March-16 | 130 Km |
94 | Soil Investigation | 400 KV D/C Orai-Orai Transmission Line | Larsen & Toubro Limited | Oct-15 | Dec-15 | 20 Nos. |
95 | Soil Investigation | 765 KV D/C Orai-Aligarh Transmission Line | Larsen & Toubro Limited | Oct-15 | Dec-15 | 34 Nos. |
96 | Soil Investigation | Soil Investigation Work of 220 KV DC Sheikpura - Nawada Transmission Line | Larsen & Toubro Limited | Oct-15 | Dec-15 | 52 Nos. |
97 | Soil Investigation | Soil Investigation work of 220 kv DC Darbhanga(GSS) - Laukhi(GSS) Transmission Line | Larsen & Toubro Limited | Oct-15 | Dec-15 | 84 Nos. |
98 | Check Survey | 400 kv Quad Moose Jaipuram To Nirmal Transmission Line | Larsen & Toubro Limited | Oct-15 | Nov-15 | 47 Km |
99 | Topographical/ Contour Survey | Lucknow Residency | Archaeological Survey of India | Feb - 16 | March-16 | 56 Acre |
100 | Topographical/ Contour Survey | Shravasti | Archaeological Survey of India | Feb - 16 | March-16 | 395 Acre |
101 | Route Alignment, Detailed & Check Survey | 132 Kv DCDS Jabalpur-Panagar/Madhotal line at Lilo for 132 kvS/S Vijay Nagar | MP Power Transmission Co. Ltd. Jabalpur | Feb - 16 | April-16 | 2.2 Km |
102 | Route Alignment, Detailed & Check Survey | 765 Raipur-Sundergarh | Larsen & Toubro Limited | March-16 | Running | 110 Km |
103 | Route Alignment, Detailed & Check Survey | 400 132kV TL For Connectivity to Upcoming New 132/33 Kv Grid Substation at Ramgarh ( Dist. -Kaimur) | Larsen & Toubro Limited | March-16 | April-16 | 18 Km |
104 | Route Alignment, Detailed & Check Survey | 400 Lilo of 132 kv Biharsharif-Nawada_at Warsaliganj | Larsen & Toubro Limited | March-16 | April-16 | 17 Km |
105 | Route Alignment, Detailed & Check Survey | Lilo of 132 kv Chapra-Siwan_at siwan | Larsen & Toubro Limited | March-16 | April-16 | 37Km |
106 | Soil Investigation | 132kV TL For Connectivity to Upcoming New 132/33 Kv Grid Substation at Ramgarh ( Dist. -Kaimur) | Larsen & Toubro Limited | March-16 | April-16 | 16 Loc |
107 | Soil Investigation | Lilo of 132 kv Biharsharif-Nawada_at Warsaliganj | Larsen & Toubro Limited | March-16 | Running | 16 Loc |
108 | Soil Investigation | Lilo of 132 kv Chapra-Siwan_at siwan | Larsen & Toubro Limited | March-16 | Running | 35 Loc |
109 | Route Alignment, Detailed & Check Survey | 400 kv DC Cudapah-Madhugiri | Larsen & Toubro Limited | April-16 | Running | 260 Km |
110 | Route Alignment, Detailed & Check Survey | 400 KV D/C Nabinagar-Patna | KEC International | May-16 | Running | 145 Km |